No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV.PRIMA CIPTA DESIGN - 02.292.886.5-713.000 | 83,0 | 78,0 | 87,75 | Rp. 306.504.000,00 |
Rp. 306.504.000,00 |
Rp. 303.864.000,00 | ||||||||
2 | Bhakti Nusa Perkasa - 02.454.976.8-713.000 | 81,0 | 81,0 | |
|
||||||||||
3 | CV. BORNEO PERKASA CONSULTANT - 02.917.269.9-713.000 | 86,0 | 81,0 | |
|
||||||||||
4 | CV. WARINGIN ENGINEERING CONSULTANT - 02.917.247.5-713.000 | 81,0 | |
|
Tidak dapat menunjukkan Kontrak/Surat Perjanjian pengalaman sejenis tertinggi dalam kurun waktu 10 tahun terakhir paling kurang sama dengan 50 % nilai Total HPS/Pagu anggaran | ||||||||||
5 | cv.seruyan mitratama consultant - 02.821.764.4-712.000 | |
|
||||||||||||
6 | CV. POLYGONS - 02.618.529.8-711.000 | |
|
||||||||||||
7 | PT. BUANA KONTRINDO CEMERLANG - 31.723.389.8-034.000 | |
|
||||||||||||
8 | PT. BERMUDA KONSULTAN - 02.228.206.5-822.000 | |
|
||||||||||||
9 | PT FENDEL STRUCTURE ENGINEERING - 03.241.580.4-822.000 | |
|
||||||||||||
10 | CV. TEKNIKKARYA ENGINEERING - 76.000.027.3-711.000 | |
|
||||||||||||
11 | CV. FOCUS INTERMEDIA CONSULTANT - 02.618.507.4-711.000 | |
|
||||||||||||
12 | cv.kotawaringin mitratama consultant - 02.459.466.5-712.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak