No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | SH | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. ARCHIPLAN REKA GHRADIKA - 02.549.954.2-713.000 | 90,63 | 90,63 | 87,77 | Rp. 248.435.000,00 |
Rp. 248.435.000,00 |
||||||||||
2 | CV.PRIMA CIPTA DESIGN - 02.292.886.5-713.000 | 83,59 | 83,59 | 75,36 | Rp. 249.535.000,00 |
Rp. 249.535.000,00 |
||||||||||
3 | cv.seruyan mitratama consultant - 02.821.764.4-712.000 | 5,0 | 5,0 | |
|
|||||||||||
4 | cv.kotawaringin mitratama consultant - 02.459.466.5-712.000 | |
|
SBU HABIS MASA BERLAKUNYA | ||||||||||||
5 | CV. HARIS ATATAMA - 80.132.682.8-711.000 | 5,0 | 5,0 | |
|
|||||||||||
6 | CV.DUTA ARYA DESAIN - 01.966.300.4-514.000 | |
|
|||||||||||||
7 | CV. BATU SULI ENGINEERING - 02.978.404.8-711.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak